Jamie T: 'They Told Me it Rained' Music video
Unit call time - 5pm
Main production contacts:
Nicola Dixon
ndixon@chenderit.northants.sch.uk
Emily Sommerfeld
07987567099
Emily Sommerfeld
07987567099
Megan Ferry
meganferry123@hotmail.com
07794221704
Location: Emily's house (Middleton Cheney - bathroom, kitchen, hallway and outside)
Preliminary schedule:
5:00 Ensure actors and location are ready for filming
5:20 Set up camera, tripod and check that camera is in working order. Run through shots with actor.
5:30 Begin filming in the hallway using tripod on wheels (dolly tripod)
5:55 Run through shots in classroom with actor
6:00 Film shots in the kitchen
6:30 Have a break from filming and look over shots to check if any more need to be filmed
6:40 Resume filming any additional shots in kitchen
7:00 Move filming equipment to bathroom and run through shots with crew and actor
7:00 Move filming equipment to bathroom and run through shots with crew and actor
7:30 Collect all equipment and ensure location is left how if was found
Transport: Myself to be walking from school to house and driving home afterwards, actors to drive to and from location - bus services available if necessary.
Health and Safety:
All members of the set have to wear appropriate clothing that fits well and will not make them too hot or cold (especially with the contribution of heat from lights).
At least one phone on set that is fully charged in the instance where medical assistance is required.
Lights to be kept at a safe distance from actors and crew members to prevent burns from hot bulbs.
Authorised personnel only allowed on the set which will be monitored by crew members - ensuring the safety of all actors, crew and those entering set.
Production Requirements:
Catering: food will be available at location
Toilets: very close
Transport: will be arranged
Medical: not required.
Communication: via mobile phone (email, text and calls)
No comments:
Post a Comment